双乳被一左一右吃着的,无码人妻精品一区二区三区在线,真人高清实拍女处被破的视频,啊灬啊灬啊灬快灬高潮了女

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
Industry news

Where are you now:Home >> News >> Industry news
What problems need to be considered in PCBA processing?
Time:2023-11-23 Read: 2185

What issues need to be considered during PCBA processing?

1. Design of single board transmission and positioning elements for automated consumption lines


For automated production line assembly, PCBA must have the ability to transmit edges and optical positioning symbols, which is a prerequisite for production.


2. PCBA processing and assembly process design


The component design structure of the components on the front and back of the PCBA determines the process methods and methods during assembly.


3. Component planning and design


The position, direction and spacing design of components on the assembly surface. The design of components depends on the welding method used, and each welding method has specific requirements for the placement, direction and spacing of components.


4. Assembly process design


For the design of welding pass-through rate, through the matching design of pads, solder masks and stencils, the quantitative and fixed-point stable distribution of solder paste is completed; through the design of planning and wiring, the simultaneous melting and solidification of all solder joints in a single package is completed; Reasonable connection design of holes, 75% tin penetration rate, etc., these design purposes are to improve the welding yield.


Matters needing attention in PCBA processing and welding


1. Warehouse management personnel should wear anti-static gloves when sending materials and testing IQC, and use the instrument to be firmly grounded, and the work surface should be covered with anti-static rubber pads in advance.


2. During the operation, use an anti-static work surface, and at the same time use an anti-static container to hold components and semi-waste products. Some welding equipment can be grounded, and the electric soldering iron must be of anti-static type. All equipment must be tested before use.


3. When the PCBA is processed through the furnace, because the pins of the plug-in components are scoured by the tin flow, some plug-in components will be inclined after being welded in the furnace, causing the component body to exceed the silk screen frame. Therefore, the repair welding personnel after the tin furnace are requested to Abort proper correction.


4. When soldering horns and batteries, PCBA should pay attention that the solder joints should not be too much tin, and should not cause short circuits or scattered surrounding components.


5. The PCBA substrate needs to be placed uniformly, and the bare boards cannot be stacked directly. For stacking, it needs to be packed in electrostatic bags.


Precautions for PCBA processing finished product assembly


1. The whole machine without shell uses anti-static packaging bags


Regularly inspect anti-static tools, devices and materials to ensure that the working conditions meet the requirements.


2. Follow the steps below when assembling the finished product


Warehouse → production line → production line upgrade software → assemble into a complete machine → QC test → write IMEI number → QA full inspection → restore factory settings → storage; software must be upgraded before assembly. Due to improper welding, short circuit, operation process problems, etc., it cannot be upgraded, resulting in misjudgment of poor PCBA.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.ya198.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
亚洲av永久纯肉无码精品动漫 | 丰满人妻熟妇乱又伦精品| 97精品人妻一区二区三区香蕉 | 国产亚洲人成a在线v网站| 久久精品一区二区三区四区| 久久精品国产亚洲av无码麻豆| 调教女m屁股撅虐调教| 无套内谢少妇毛片a片999| 久久久人人人婷婷色东京热| 少妇饥渴偷公乱A级无码| 国产综合精品| 少妇又色又紧又爽又刺激视频 | 吃奶呻吟打开双腿做受动态图| 国产精品乱码人妻一区二区三区| 亚洲国产成人精品无码区在线观看| 国产精品亚洲一区二区三区在线| 97色偷偷色噜噜狠狠爱网站97| 国产精品理论片在线观看| 欧美猛男军警gay自慰| 美女把尿口扒开让男人桶| 国产美女久久精品香蕉69| 丰满老女人a片| 男生把手放进我内裤揉摸好爽| 黑人巨大精品欧美黑寡妇| 男女交性视频无遮挡全过程| 精品无码人妻一区二区三区品 | 我的漂亮女房东完整版在线韩剧| 国产av精品国语对白国产| 亚洲第一成人网站| 成人免费无码成人影院日韩| 熟女少妇丰满一区二区| 性视频播放免费视频| 亚洲午夜久久久久妓女影院| 久久免费看黄a级毛片| 久久精品国产亚洲av麻豆不片| 精品免费囯产一区二区三区四区| 香蕉久久一区二区不卡无毒影院 | 人妻丰满AV无码久久不卡| 24adc年龄确认18周岁进入| 国产精品无码一本二本三本色∴| 校长把校花按在桌上看|